The land
Live connected
to nature.
Tropical dry forest, open green space, and hills that hold a view of the Catalinas islands.
Seven reasons
What makes this land different.
Live connected to nature
Tropical dry forest and open green space, preserving Guanacaste's character while keeping each homesite private.
Farm-to-table lifestyle
Community gardens and greenhouse space, for a closer relationship with the food you eat.
Ranch & equestrian
A dedicated ranch area with horses — countryside atmosphere rarely found this close to the coast.
Miles of nature trails
Walking and biking trails through the community for exercise, wildlife and outdoor living.
Designed for connection
A community rancho and shared spaces for gatherings, family activities and quiet afternoons.
Close to everything
Minutes from Playa Penca, Potrero and Marina Flamingo; an hour from Liberia airport.
Invest early
Secure land in a strategic location before Potrero and Flamingo reach their full potential.
Arrival
Roads cut, power going in.
Internal roads are graded and gravelled, and electrical posts are being set along them.
Open ground
Cleared, planted, and coming back.
What was cleared during earthworks was largely non-native bamboo, and those areas are being replanted. The intent is a community that leaves the ridgelines wooded and keeps the forest between homesites.
Build timeline
What is going up, and when.
Construction is underway across the community. Dates are the actual start and completion milestones on site.
August 15
House 1 began
Ground broken on the first home, setting the architectural language for the community.
September 5
House 2 begins
The second residence starts, three weeks behind the first.
September 10
Community centre
Work starts on the rancho — the shared space for gatherings, events and family afternoons.
September 10
Front gate
Construction begins on the gated entrance at the head of Monkey Trail.
September 15
Horse arena
The equestrian arena begins — the heart of the ranch and its riding programme.
November 1
Gates completed
The gated entrance at the head of Monkey Trail is finished and in service.
November 15
Art studio
Work begins on the community art studio.
December 1
Main road complete
The primary internal road finished end to end, with power set along its length.
House 1 — foundations and steel in place
House 1 — the pour